Layout
Layout
ea
ea
in
in
in

Out-to-out of stringers

in

Along flight 1

in

Between the two flights

Stringers
Stringers
lb/ft
in

Added to each stringer

Landings
Landings
ea

All the same size

$/sq.ft

Landing area

X beams — across the stair

Run across flight 1, spanning the landing width

lb/ft
ea
in

Y beams — along the stair

Run in flight 1's direction of travel — e.g. landing edges and the U-stair well

lb/ft
ea
in
Material pricing
Material pricing

Example rates — replace with your own prices.

$/tread

Includes tread finish

$/lb
%

Clips, plates, angles, bolts, welds — % of steel weight

Finishes
Finishes
$/ft

Per ft of stringers and landing beams. Tread finish is included in the tread supply price.

Labour
Labour
hrs

Total shop hours

$/hr
Detailing
Detailing
$

Shop drawings — lump sum

Installation
Installation
$

Erection crew, equipment, travel — lump sum

Freight
Freight
$

Delivery to site — lump sum

Markup
Markup
%

On the subtotal

PST
PST
%

On materials only (steel + treads). GST excluded.

Stair framing plan — Scale: NTS

Budget estimate

$0.00

Item Qty Length Weight Cost

Rates and allowances are example values — replace them with your own shop's numbers. Prices exclude GST.